Training Survey and Profile Using Total Station - BBM TRAINING AND CONSULTING

Training Terbaru

Jadwal Training 2020

Start Date

Duration

Registrasion Form

06 January 2020

1/2/3/5 Days

Registration Form Link

06 January 2020

1/2/3/5 Days

Registration Form Link

03 February 2020

1/2/3/5 Days

Registration Form Link

02 March 2020

1/2/3/5 Days

Registration Form Link

27 April 2020

1/2/3/5 Days

Registration Form Link

18 May 2020

1/2/3/5 Days

Registration Form Link

22 June 2020

1/2/3/5 Days

Registration Form Link

20 July 2020

1/2/3/5 Days

Registration Form Link

17 August 2020

1/2/3/5 Days

Registration Form Link

14 September 2020

1/2/3/5 Days

Registration Form Link

12 October 2020

1/2/3/5 Days

Registration Form Link

09 November 2020

1/2/3/5 Days

Registration Form Link

01 December 2020

1/2/3/5 Days

Registration Form Link

Training Survey and Profile Using Total Station

Training Survey and Profile Using Total Station
INTRODUCTION
In this course the participants will review the principal surveying engineering. They will be explore surveying including surveying meaning, survey types and map contains. They will also be intoduced to survey instruments and measurements principals and will learn how to use them. Finally the course is concluded by an intoduction to survey engineering computer software AutoCAD.
 PROGRAM OBJECTIVES
  • Discussing the principal surveying engineering
  • Identify and recognize the various survey instruments with simulation program including tape, theodolite, level, total station
  • Learning how to use each tool 
  • Practicing the survey engineering computer software covering AutoCAD 
WHO SHOULD ATTEND?
  • Project Administrators
  • Engineers
  • Managers
  • Superintendents 
  • Anyone interested in survey & profile using total station 
PROGRAM OUTLINE
  • Survey meaning
  • Survey types
  • Map contains
  • Survey Instruments , Measurements principals
  • Survey Instruments with Simulation Program
  • Tapes
  • When to use tapes
  • How to use them
  • Available types
  • Theodolite
  • Types of Theodolites
  • Parts of a Theodolite
  • Concept of operation
  • Errors in measurement
  • Advantages of using a Theodolite
  • Levels
  • Parts of a level
  • Measuring with the level
  • Line levelling
  • Longitudinal and transverse profiles
  • The digital level
  • The rotation laser
  • Total Station
  • Preparing to measure
  • Extrapolating a straight line
  • Polar setting-out of a point
  • Plumbing down from a height point
  • Surveys (polar method)
  • Applications programs
  • Calculating areas
  • Staking out
  • Remote heights
  • Tie distances
  • Free-station surveys
  • Creating a survey database
  • Using AutoCAD
  • Making an equipment database current
  • Deleting an equipment definition
  • Setting up the database and drawing
  • Setting the equipment and figuring prefix databases


Form Request Training